ADraft
Put a finger on a joint and drag to a grid point. The ghost member shows its length and price before you let go; red means it is not allowed. Undo, redo, erase, pan and zoom whenever you like - the budget updates live.
Bridge-building physics puzzle · Android
Lay roads, timber beams, steel girders and cables on a 1 m grid, press Test and watch cars, buses and water tankers roll across while every piece of your bridge is coloured by how hard it works. 55 levels, five zones, three stars each.
| Project | Skybridge Architects | Levels | 55 in 5 zones |
|---|---|---|---|
| Price | Free · no ads · no IAP | Stars | 165 |
| Drawn by | you | Rating | 13+ · offline |
Put a finger on a joint and drag to a grid point. The ghost member shows its length and price before you let go; red means it is not allowed. Undo, redo, erase, pan and zoom whenever you like - the budget updates live.
The simulation takes over: vehicles drive across while every member glows from green (relaxed) through yellow to red (about to break). A replay of any passing test plays back exactly the same way.
Overloaded members snap and show you exactly where the bridge gave up. Add a triangle, shorten a long beam that gets squeezed, switch to steel - and test again. No timers, unlimited retries.
Z1
Timber road and timber beams
Your first spans over a lazy river: prop up a sagging road, learn why triangles hold their shape, build trusses below and above the deck, climb uneven banks and lean on a rock pillar.
Z2
Steel road, steel girders, support piers
Cargo trucks and city buses arrive. Steel is strong and stiff but heavy and pricey - and on the dashed foundation pads you can stand concrete support piers.
Z3
Cables, pylons, suspension
Deep glacier gorges with nothing to lean on below. Hang the deck from pylons with cables that only pull, build cable stays and full suspension bridges.
Z4
Gusty wind, carbon struts, water tankers
Sea gusts push on every beam, updrafts lift the deck and the 8-tonne water tanker is the heaviest load in the game. Carbon struts are feather-light - and expensive.
Z5
Moving lift platforms
Lift platforms bob up and down over the canals. Spans pinned to them have to tilt and flex as they move - stiff cable stays tied to a moving end snap.
The same numbers the game uses. Strength is pull / push in game units; roads are the only pieces vehicles can drive on and may climb at most 45°. Support piers stand on foundation pads.
| Material | Cost | Strength | Weight | Reach | Notes |
|---|---|---|---|---|---|
| Timber road | $120/m | 80 | 120 kg/m | 2.3 m | cheap deck - vehicles drive on roads |
| Steel road | $300/m | 200 | 220 kg/m | 2.3 m | heavy-duty deck for trucks and buses |
| Timber beam | $90/m | 70 / 55 | 70 kg/m | 2.9 m | light; weak when long and squeezed |
| Steel girder | $220/m | 190 / 160 | 140 kg/m | 3.2 m | strong and stiff, heavy |
| Steel cable | $110/m | 180, pull only | 25 kg/m | 12.5 m | goes slack when pushed |
| Carbon strut | $380/m | 260 / 210 | 40 kg/m | 4.5 m | feather-light, very strong |
Loads: Compact car 1 t · Delivery van 2 t · Cargo truck 4.5 t · City bus 6 t · Water tanker 8 t.
Stars add up across attempts, so a lean bridge and a sturdy bridge can each earn their own. A level counts as passed when every vehicle reaches the flag and you stayed within the budget. Every one of the 55 levels has been solved with all three stars by a reference design running the game's own simulation.




Write to [email protected] or use the support form.